No |
Project Title |
Project Description |
Location |
Period |
Client |
|
1 |
Provision of SBM Drydock 2010-2011 |
Drydocking and modification of two (2) unit of the Single Buoy Mooring (SO-1048 & SO-1077). Replating, Blasting, Coating, MRB and Swivel Replacement, Include project management on change-out of the SBM |
Senipah Terminal |
2010 - 2011 |
Total E&P Indonesie |
|
2 |
KLO Pipeline Installation | Project Management, Detail Engineering, Procurement of Company Unfurnished Material, Fabrication of Riser and Riser Clamp. Installation of 25 Km x 12” subsea pipeline from Onshore Tj. Jumlai to Sepinggan T Platform incl. riser and post-trenching at Tj. Jumlai, Installation of 11 Km x 4” subsea pipeline from Attaka “O” to Attaka “F” Platform incl. riser bothside. Installation of 800m x 4” subsea pipeline from Sepinggan Prod. to Sepinggan “V” Platform incl riser bothside |
Tj. Jumlai, Sepinggan Field, Attaka Field, East Kalimantan -Offshore |
2010 - 2011 |
Chevron Indonesia Company |
|
3 |
Engineering, Procurement & Refurbishment of Santan SPM Facility | Engineering, include piping modification and central well modification. Procurement of material and parts, Refurbishment work design for next 10yr | Penajam Supply Base – East Kalimantan. Jakarta. |
2010-2011 |
Chevron Indonesia Company |
|
4 |
Provision Of SPM Ardjuna Marine Terminal | Engineering, Project Specification for CALM Buoy 12M, Procurement of CALM Buoy 12M material, include OEM part from SBM offshore, Fabrication and delivery of CALM Buoy 12M, cap. 350.000DWT | Marunda Warehouse – Ardjuna Terminal Offshore North West Java |
2010-2011 |
Pertamina Hulu Energi - ONWJ |
|
5 |
Offshore Installation of 6” Sub Sea Pipeline ZELDA-D to ZELDA-PC | Pick up Company Issued Pipeline Material & transportation to the Field Location, Install ZELDA-D to ZELDA-PC 6” Pipeline Installation 6 km, Installation of sand bag, concrete pipe support. Pigging, hydro test and tightening of 6” Pipeline.Mobilization Demobilization of Offshore installation Spread | Zelda D - Zelda PC CNOOC Field |
2010 |
CNOOC SES Ltd. |
|
6 |
Offshore Installation of 16” Sub Sea Pipeline Karmila-A to Titi-A | Pick up Company Issued Pipeline Material & transportation to the Field Location, Install KARMILA-A TO TITI-A 16” Pipeline Installation from Riser to Riser 25 km, Install sub sea Tee and Valves, Installation of 16” Pipeline from the Sub Sea Tie-in to existing Pipelines. Installation of sand bag, concrete pipe support. Pigging, hydro test and tightening of 16” Pipeline.Mobilization Demobilization of Offshore installation Spread | Karmila A - Titi A CNOOC Field |
2009 - 2010 |
CNOOC SES Ltd. |
|
7 |
EPC Penggantian Submarine Pipeline Untuk SPM 35.000 DWT | EPC Submarine Pipeline System Replacement For SPM 35.000 DWT - Submarine Pipeline Replacement (SPM to Onshore Rec. Facility) Incl. Post Trenching 20” x 12km - PLEM Fabrication and Installation (c/w Anchor Pile)- -SPM Relocation |
Pertamina UP VI Balongan Area |
2008-2009 |
PERTAMINA RU VI Balongan |
|
8 |
For Air Diving Spread for Pipeline Repair At KKNA-KKNB and KLA-KLB | Diving Spread for Pipeline Repair At KKNA-KKNB and KLA-KLB, Water dept 40 meter pipe size 12” Ø | Java sea area approximately 100-120 miles North East of Jakarta Indonesia KKNA-KKNB and KLA-KLB |
2008 |
BP West Java Ltd. |
|
9 |
KG Platform Modification Services |
Modification of Offshore Platform included: -Topside Piping Works -Electrical and Instrumentation Work -Civil Structural Works, Including -Deck Extension -Marine Construction Support (Accommodation Work Barge) |
Natuna Sea – Kakap Block |
2007-2008 |
Star Energy (Kakap) Ltd. |
|
10 |
Overhaul Calm Buoy SPM II DPPU Soekarno Hatta – Cengkareng Type Imodco 1559 |
Overhaul SPM II Type IMODCO 1559 Kap 35.000 DWT: -Refurbishment of the SPM -Installation of temporary SPM -Replacement of chain anchor 6 ea -Bearing removal and installation -Mob and de-mob equipment and temporary SPM -Test and Commissioning |
Pertamina SKH-Cengkareng |
2007-2008 |
PERTAMINA UPMS III |
|
11 |
Major Maintenance Calm Buoy SPM type SBM SO-1232 di PT.PERTAMINA (PERSERO) UP – IV Cilacap | Overhaul SBM SO- 1232 Kap 250.000 DWT : -Refurbishment SBM SO-1232 -Installation of temporary SPM -Replacement of chain anchor 6 ea -Bearing removal and installation -Mob and de-mob equipment and temporary SPM -Test and Commissioning |
Area 70 PT.PERTAMINA UP-IV Cilacap |
2007 |
PERTAMINA UP IV Cilacap |
|
12 |
EPCI Pipeline Replacement Project, Uniform Field | Pipeline & Hook-Up Activities consist of: Offshore pipeline Installation size 6" and 10" - 3 line of riser to riser at Uniform Field, total 20km Repair leaked pipelines, Change Existing pipeline Services, Reverse the flow direction on the existing gas lift pipeline system Re-activate 3 (three) existing platforms Top side Facilities modification of 5 (five) platforms |
Java sea area approximately 100-120 miles North East of Jakarta Indonesia |
2006-2008 |
BP West Java Ltd. |
|
13 |
Provision of Services for Attaka Oscar Pipeline Repair | Installation sub marine Pipeline Dia 16” Water dept ± 75 meter from Oscar platform, along with the Risers on the both Platform | Platform Attaka Oscar - Offshore East Kalimantan |
2006 |
Chevron Indonesia Company |
|
14 |
Provision of Kerindingan Pipeline and Risers Installation |
Installation sub marine Pipeline 2 (two) 8.625” OD Water dept ± 60 meter from Krindingan Platform to Melanin Platform, along with the Risers on the both Platform | Melahin Platform & Kerindingan Platform (Offshore East Kalimantan) |
2005 |
Chevron Indonesia Company |
|
15 |
South Sumatra-West Java Gas Pipeline Project (Phase 2) | Installation Sub marine Pipeline Dia 32” long 2 x 23 KM Near shore from land full to – 25 meter water dept Incl. Pre and Post Trenching (with Jet sled) at labuhan maringgai and muara bekasi. |
Labuhan Maringgai-Pulau Damar Muara tawar/Muara karang-Tg.Periok |
2006 |
Rekin - LPR JV (PGN) |
|
16 |
Pekerjaan Penyelesaian Pembangunan Terminal transit Utama Balongan |
EPCI of Oil storage, receiving terminal & distribution facility: - Submarine Pipeline : |
Pertamina UPMS III Balongan |
2004-2007 |
PERTAMINA UPMS III Balongan |
|
17 |
Konstruksi Pipa Trunk Line dan Fasilitas Produksi untuk Mengalirkan Gas dari Stasiun Serang Menuju Koneksi Pipa JOB Pertamina Costa di Pulau Panjang (Pkl. Susu) Aceh Tamiang - Pangkalan Susu | EPCI of Gas Production Facility content of: - Gas separation system - Gas flaring system - Fire fighting system - 6" x 7 km submarine pipe line - 6" x 7 km onshore pipe line - Custody meter system - Elec., Instru. & control system - Civil & steel structure |
DOH Aceh – Pulau Panjang Pangkalan Susu |
2004 |
Pertamina D.O.H 1 Nanggroe Aceh Darussalam |
|
18 |
Provision of services for Sepinggan “V” sepinggan Production, Procurement Installation and Testing of Pipeline and Risers | Installation sub marine Pipeline from Sepinggan “V” platform , along with the Risers on the both Platform : 6" x 4 km submarine gasline WD 60 meter | Sepinggan Balikpapan |
2004 |
Unocal Indonesia Company |
|
19 |
Tank cleaning & Sludge Processing For Tank 1302-A AT Santan Terminal |
Provide full package of tank clearing and sludge processing services to clean the Crude Storage Tank A capacity 500.000 bbls | AT.Santan Terminal Balikpapan |
2003 |
Unocal Indonesia Company |
|
20 |
Drilling Specialist Services |
Drilling Specialist and a highly qualified Drilling & Workover Engineering work. |
Kakap FPSO - Natuna Sea |
2002 |
Gulf Resources (Ramba) Ltd. |
|
21 |
Utrasonic Thickness Gauging inspection Services | Inspection of Plate Thickness of Hull and Steel structure of Kakap Natuna FPSO - Call Out Basis |
Kakap FPSO - Natuna Sea |
2002-2003 |
Gulf Resources (Ramba) Ltd. |
|
22 |
"Live" FPSO Kakap Natuna Kakap Natuna Refurbishment Maintenance Services Phase 2 (two) |
Phase Two will include : Cargo and ballast tank steel tank steel work repairs and blasting and coating renewals. Cargo and ballast system pipe lines and valve renewals/overhaul. | Kakap FPSO - Natuna Sea |
2001-2004 |
Gulf Resources (Kakap) Ltd. |
|
23 |
"Live" FPSO Kakap Natuna Refurbishment Maintenance services/Phase 1 (one) |
Phase One include : Deck, Machinery, Piping and Ducting Modification |
Kakap FPSO - Natuna Sea |
2000-2001 |
Gulf Resources (Kakap) Ltd. |
|
24 |
Diving Work For FPSO Anoa |
Furnish all labor, diver, supervision, equipment tools for complete professional Services. | Anoa FPSO - Natuna Sea |
2001 |
Premier Oil Natuna Sea Ltd. |
|
25 |
Kakap Natuna SPM Anchor Chain Tensioning |
Remedial Campaign of Kakap Natuna SPM include: Detail Engineering design work, equipment, personnel (engineer and top side crew) and replacement. |
Kakap FPSO - Natuna Sea |
2000 |
Gulf Resources (Kakap) Ltd. |
|
26 |
Penggantian Floating Hoses SBM SO-112 |
Engineering design,Procurement, Installation Submarine HosesCommisioning, Give Training for operator, and all related facilities construction followed by installation. | UPPDN IV Semarang |
1999 |
Pertamina Pusat Direktorat PPDN |
|
27 |
Pekerjaan Penambahan Jalur Pipa Supply, Dia.16" Dan SPM di DPPU Soekarno-Hata Cengkareng, UPPDN III | EPCI of Oil stroge & distribution facility content of : - Installation Submarine Pipeline 9 Km long 16" dia - SPM 17.500 DWT Fabrication c/w ABS certification - Custody meter system - PLC - Elec, Instru & control system - Civil & steel structure works |
SKH Cengkareng |
1996-1998 |
Pertamina, UPPDN III |
|
28
|
Pemasangan Sementara SPM IMODCO 150.000 DWT EX-CONOCO dan Overhaul SBM SO-1122 |
Modification and refurbishment of SPM SO-1122 and installation of temporary SPM IMODCO 150.000 DWT. Overhaul SBM SO-1122 : - Engineering design for new modification - Procurement for all material - Construction - Inspection and test for all works |
Pertamina UPPDN IV Pelsus-Semarang |
1997 |
Pertamina Pusat Direktorat PPDN |
|
29 |
Perbaikan Pergantian 8 Unit Rubber Fender pada Main sub Breasting Dholpin Dermaga II Terminal Trans-Tanjung Gerem |
Refurbishment and replacement of 8 unit Rubber fender for sub Breasting Dholpin Dermaga II at Transit Tanjung Gerem, Merak. Include Engineering design, Civil construction dan Procurement all the material |
Pertamina UPPDN III Tanjung Gerem |
1997 |
Pertamina Pusat Direktorat PPDN
|
|
30 |
Overhaul SBM 35.000 DWT | Overhaul SBM 35.000 DWT Re-plating and refurbishment. |
Pelsus PKK UP-VI Balongan |
1996 |
PERTAMINA UP VI Balongan |
|
31 |
Oil Storage "Cilacap" Vessel Repair | Forepeak Tank-Steel and ladder renewals, location above bottom floor (NWT) from oil tight bulkhead.Poopdeck Replating, outline to crop and renew poop deck plating and install new deck beam, poop deck between and forward to deckhouse to port of ship centerline and forward port side of accommodation. | Conoco Field, Natuna, South China Sea |
1994-1995 |
Conoco Indonesia Inc.
|
|
32 |
Mooring Buoy and Concrete Block Fabrication | Provide the necessary personnel, material, equipment, tools and supplies to fabricate mooring buoy and concrete block. | Conoco Field, Natuna, South China Sea |
1994 |
Conoco Indonesia Inc. |