Our Experience

Please click project title for project detail.


No
Project Title
Project Description
Location
Period
Client
1
Provision of SBM Drydock 2010-2011
Drydocking and modification of two (2) unit of the Single Buoy Mooring (SO-1048 & SO-1077). Replating, Blasting, Coating, MRB and Swivel Replacement, Include project management on change-out of the SBM

Senipah Terminal
(East Kalimantan)

2010 - 2011
Total E&P Indonesie
2
KLO Pipeline Installation Project Management, Detail Engineering, Procurement of Company Unfurnished Material, Fabrication of Riser and Riser Clamp.
Installation of 25 Km x 12” subsea pipeline from Onshore Tj. Jumlai to Sepinggan T Platform incl. riser and post-trenching at Tj. Jumlai,

Installation of 11 Km x 4” subsea pipeline from Attaka “O” to Attaka “F” Platform incl. riser bothside.

Installation of 800m x 4” subsea pipeline from Sepinggan Prod. to Sepinggan “V” Platform incl riser bothside
Tj. Jumlai, Sepinggan Field, Attaka Field,
East Kalimantan -Offshore
2010 - 2011
Chevron Indonesia Company
3
Engineering, Procurement & Refurbishment of Santan SPM Facility Engineering, include piping modification and central well modification. Procurement of material and parts, Refurbishment work design for next 10yr Penajam Supply Base – East Kalimantan. Jakarta.
2010-2011
Chevron Indonesia Company
4
Provision Of SPM Ardjuna Marine Terminal Engineering, Project Specification for CALM Buoy 12M, Procurement of CALM Buoy 12M material, include OEM part from SBM offshore, Fabrication and delivery of CALM Buoy 12M, cap. 350.000DWT Marunda Warehouse – Ardjuna Terminal Offshore North West Java
2010-2011
Pertamina Hulu Energi - ONWJ
5
Offshore Installation of 6” Sub Sea Pipeline ZELDA-D to ZELDA-PC Pick up Company Issued Pipeline Material & transportation to the Field Location, Install ZELDA-D to ZELDA-PC 6” Pipeline Installation 6 km, Installation of sand bag, concrete pipe support. Pigging, hydro test and tightening of 6” Pipeline.Mobilization Demobilization of Offshore installation Spread Zelda D - Zelda PC
CNOOC Field
2010
CNOOC SES Ltd.
6
Offshore Installation of 16” Sub Sea Pipeline Karmila-A to Titi-A Pick up Company Issued Pipeline Material & transportation to the Field Location, Install KARMILA-A TO TITI-A 16” Pipeline Installation from Riser to Riser 25 km, Install sub sea Tee and Valves, Installation of 16” Pipeline from the Sub Sea Tie-in to existing Pipelines. Installation of sand bag, concrete pipe support. Pigging, hydro test and tightening of 16” Pipeline.Mobilization Demobilization of Offshore installation Spread Karmila A - Titi A
CNOOC Field
2009 - 2010
CNOOC SES Ltd.
7
EPC Penggantian Submarine Pipeline Untuk SPM 35.000 DWT EPC Submarine Pipeline System Replacement For SPM 35.000 DWT
- Submarine Pipeline Replacement (SPM to Onshore Rec. Facility) Incl. Post Trenching 20” x 12km
- PLEM Fabrication and Installation (c/w Anchor Pile)- -SPM Relocation
Pertamina UP VI Balongan Area
2008-2009
PERTAMINA RU VI Balongan
8
For Air Diving Spread for Pipeline Repair At KKNA-KKNB and KLA-KLB Diving Spread for Pipeline Repair At KKNA-KKNB and KLA-KLB, Water dept 40 meter pipe size 12” Ø Java sea area  approximately 100-120 miles North East of Jakarta Indonesia
KKNA-KKNB and KLA-KLB
2008
BP West Java Ltd.
9
KG Platform Modification Services
Modification of Offshore Platform included:

-Topside Piping Works
-Electrical and Instrumentation Work
-Civil Structural Works, Including -Deck Extension
-Marine Construction Support (Accommodation Work Barge)
Natuna Sea – Kakap Block
2007-2008
Star Energy (Kakap) Ltd.
10
Overhaul Calm Buoy SPM II DPPU Soekarno Hatta – Cengkareng
Type Imodco  1559
Overhaul SPM II Type IMODCO 1559 Kap 35.000 DWT:

-Refurbishment of the SPM
-Installation of temporary SPM
-Replacement of chain anchor 6 ea
-Bearing removal and installation
-Mob and de-mob equipment and temporary SPM
-Test and Commissioning
Pertamina SKH-Cengkareng
2007-2008
PERTAMINA UPMS III
11
Major Maintenance Calm Buoy SPM type SBM  SO-1232 di PT.PERTAMINA (PERSERO) UP – IV Cilacap Overhaul SBM SO- 1232 Kap  250.000 DWT :

-Refurbishment SBM SO-1232
-Installation of temporary SPM
-Replacement of chain anchor 6 ea
-Bearing removal and installation
-Mob and de-mob equipment and temporary SPM
-Test and Commissioning
 Area 70 PT.PERTAMINA UP-IV Cilacap
2007
PERTAMINA UP IV Cilacap
12
EPCI Pipeline Replacement Project, Uniform Field Pipeline & Hook-Up Activities consist of:

Offshore pipeline Installation size 6" and 10" - 3 line of riser to riser at Uniform Field, total 20km

Repair leaked pipelines, Change Existing pipeline Services, Reverse the flow direction on the existing gas lift pipeline system

Re-activate 3 (three) existing platforms

Top side Facilities modification of 5 (five) platforms
Java sea area  approximately 100-120 miles North East of Jakarta Indonesia
2006-2008
BP West Java Ltd.
13
Provision of Services for Attaka Oscar Pipeline Repair Installation sub marine Pipeline Dia 16”  Water dept ± 75 meter from   Oscar platform, along with the Risers on the both Platform Platform Attaka Oscar - Offshore East Kalimantan
2006
Chevron Indonesia Company
14
Provision of Kerindingan Pipeline and Risers Installation
Installation sub marine Pipeline 2 (two) 8.625” OD Water dept ± 60 meter from Krindingan Platform to Melanin Platform, along with the Risers on the both Platform Melahin Platform & Kerindingan Platform (Offshore East Kalimantan)
2005
Chevron Indonesia Company
15
South Sumatra-West Java Gas Pipeline Project (Phase 2) Installation  Sub marine Pipeline Dia 32”  long 2 x 23 KM
Near shore from land full to – 25 meter water dept Incl. Pre and Post Trenching (with Jet sled) at labuhan maringgai and muara bekasi.
Labuhan Maringgai-Pulau Damar Muara tawar/Muara karang-Tg.Periok
2006
Rekin - LPR JV (PGN)
16
Pekerjaan Penyelesaian Pembangunan Terminal transit Utama Balongan

EPCI of Oil storage, receiving terminal & distribution facility:

design, procure, fabrication & installation of:

- Submarine Pipeline :  
 15.5 Km long 32" dia  & 10.5 Km long 16" dia Incl. Post Trenching
- On Shore Pipe :   
2.5 Km long 32" & 10 Km long 16" DiaFabrication &
- SPM 150.000 DWT 35.000 DWT c/w ABS certification
- 2 ea 50.000 KL floating roof tank
- 5 ea 50.000 Kl flx roof tank
- 5 ea 10.000 Kl flx roof tank
- Custody meter system
- Elec, Instru & control system (PLC)
- Civil & steel structure

Pertamina UPMS III Balongan
2004-2007
PERTAMINA UPMS III Balongan
17
Konstruksi Pipa Trunk Line dan Fasilitas Produksi untuk Mengalirkan Gas dari Stasiun Serang Menuju Koneksi Pipa JOB Pertamina Costa di Pulau Panjang (Pkl. Susu) Aceh Tamiang - Pangkalan Susu EPCI of Gas Production Facility content of:
- Gas separation system
- Gas flaring system
- Fire fighting system
- 6" x 7 km submarine pipe line
- 6" x 7 km onshore pipe line
- Custody meter system
- Elec., Instru. & control system
- Civil & steel structure
DOH Aceh – Pulau Panjang  Pangkalan Susu
2004

Pertamina D.O.H 1 Nanggroe Aceh Darussalam

18
Provision of services for Sepinggan “V” sepinggan Production, Procurement Installation and Testing of Pipeline and Risers  Installation sub marine Pipeline   from Sepinggan “V” platform , along with the Risers on the both Platform : 6" x 4 km submarine gasline WD 60 meter Sepinggan Balikpapan
2004
Unocal Indonesia Company
19
Tank cleaning & Sludge Processing For Tank 1302-A AT Santan Terminal
Provide full package of tank clearing and sludge processing services to clean the Crude  Storage Tank A capacity 500.000 bbls AT.Santan Terminal Balikpapan
2003
Unocal Indonesia Company
20
Drilling Specialist Services
Drilling Specialist and a highly qualified Drilling & Workover Engineering work.

Kakap FPSO - Natuna Sea

2002
Gulf Resources (Ramba) Ltd.
21
Utrasonic Thickness Gauging inspection Services Inspection of Plate Thickness of Hull and Steel structure of Kakap Natuna FPSO - Call Out Basis

Kakap FPSO - Natuna Sea

2002-2003
Gulf Resources (Ramba) Ltd.
22
 "Live" FPSO Kakap Natuna
Kakap Natuna Refurbishment Maintenance Services Phase 2 (two)

Phase Two will include : Cargo and ballast tank steel tank steel work repairs and blasting and coating renewals. Cargo and ballast system pipe lines and valve renewals/overhaul. Kakap FPSO - Natuna Sea
2001-2004
Gulf Resources (Kakap) Ltd.
23
 "Live" FPSO Kakap Natuna Refurbishment Maintenance services/Phase 1 (one)
Phase One include :
Deck, Machinery, Piping and Ducting Modification
Kakap FPSO - Natuna Sea
2000-2001
Gulf Resources (Kakap) Ltd.
24
Diving Work For FPSO Anoa
Furnish all labor, diver, supervision, equipment tools for complete professional Services. Anoa FPSO - Natuna Sea
2001
Premier Oil Natuna Sea Ltd.
25
Kakap Natuna SPM Anchor
Chain Tensioning

Remedial Campaign of Kakap Natuna SPM include:
Detail Engineering design work, equipment, personnel (engineer and top side crew) and replacement.
Kakap FPSO - Natuna Sea
2000
Gulf Resources (Kakap) Ltd.
26
Penggantian Floating Hoses SBM SO-112
Engineering design,Procurement, Installation Submarine HosesCommisioning, Give Training for operator, and all related facilities construction followed by installation. UPPDN IV Semarang
1999

Pertamina Pusat Direktorat PPDN 

27
Pekerjaan Penambahan Jalur Pipa Supply, Dia.16" Dan SPM di DPPU Soekarno-Hata Cengkareng, UPPDN III EPCI of Oil stroge & distribution facility content of :
- Installation Submarine Pipeline  9 Km long 16" dia
- SPM 17.500 DWT Fabrication c/w ABS certification
- Custody meter system
- PLC
- Elec, Instru & control system
- Civil & steel structure works

SKH Cengkareng

1996-1998

 Pertamina, UPPDN III
Jakarta

28
Pemasangan Sementara SPM IMODCO 150.000 DWT EX-CONOCO dan Overhaul SBM SO-1122
Modification and refurbishment of SPM SO-1122 and installation of temporary SPM IMODCO 150.000 DWT. Overhaul SBM SO-1122 :
- Engineering design for new modification
- Procurement for all material
- Construction
- Inspection and test for all works

Pertamina UPPDN IV Pelsus-Semarang

1997

Pertamina Pusat Direktorat PPDN 

29
Perbaikan Pergantian 8 Unit Rubber Fender pada Main sub Breasting Dholpin Dermaga II Terminal Trans-Tanjung Gerem
Refurbishment and replacement of 8 unit Rubber fender for sub Breasting Dholpin Dermaga II at Transit Tanjung Gerem, Merak. Include Engineering design, Civil construction dan Procurement all the material

Pertamina UPPDN III Tanjung Gerem

1997

Pertamina Pusat Direktorat PPDN 

 

30
Overhaul SBM 35.000 DWT Overhaul SBM 35.000 DWT
Re-plating and refurbishment.
Pelsus PKK UP-VI Balongan
1996
PERTAMINA UP VI Balongan
31
Oil Storage "Cilacap" Vessel Repair Forepeak Tank-Steel and ladder renewals, location above bottom floor (NWT) from oil tight bulkhead.Poopdeck Replating, outline to crop and renew poop deck plating and install new deck beam, poop deck between and forward to deckhouse to port of ship centerline and forward port side of accommodation. Conoco Field, Natuna, South China Sea
1994-1995
Conoco Indonesia Inc.
 
32
Mooring Buoy and Concrete Block Fabrication Provide the necessary personnel, material, equipment, tools and supplies to fabricate mooring buoy and concrete block. Conoco Field, Natuna, South China Sea
1994
Conoco Indonesia Inc.

 